SCADA system testing will be carried out at the 11 kilovolts Jalan Jerudong 3 Switch Station in the Brunei Muara District. The areas shown on the screen will experience temporary power supply cuts on 28th December.

Areas affected: Kampung Jerudong, Jalan Jerudong Spg 250, Spg 253 and surrounding areas.

Source: Radio Television Brunei